• How do you calculate excavator production per hour?

     · Essentially, excavator productivity is typically measured by the volume of loose or rock soils the machine can displace in a hour of continuous operation. Understand the formula for calculating excavator productivity. The formula is as follows: Q = (60*q*z*n*kf) / kl, where Q is the productivity of the excavator, q is the capacity of each rotor bucket in cubic feet, z is the .

    Get Price
  • COST AND PRODUCTIVITY ANALYSIS OF EQUIPMENTS FOR .

    For productivity considering blade length m (For actual blade length of m and 30 degree blade angle), maximum efficiency of 60% and distance of 1 km to be travelled in one pass and total number of 6 passes to be made per 1 km, following calculation shows per hour productivity of grader in an hour

    Get Price
  • How To Calculate Coal Crusher Productivity

    How to calculate crusher production costton 19, 2016how to calculate crusher production cost ton to calculate coal crusher productivity stone crusher is a machine designed to reduce large rocks into smaller rocks, cone crusher productivity is of coal and calculation of size reduction efficiency . calculation of actual .

    Get Price
  • Your company's name is critically important to its success generally easy to spell and certainly unique. Great entrepreneurs tackle and solve challenging issues like naming their company well, and if you can't name your company well, you're simply not worth investing in it.

    Get Price
  • Rock Crushing Rule of Thumb

     · The Crusher's Rock Breakers. The capacity of a hydraulic rock breaker is higher (and the operating cost lower) than a pneumatic rockbreaker. For these reasons, most new installations are hydraulic, despite the higher capital cost. Source: John Kelly ; For underground production rates less than 2,000 tpd, it may be economical to size theore underground with .

    Get Price
  • Unconfined Compression Test |

    The Unconfined Compression Test is a laboratory test used to derive the Unconfirmed Compressive Strength (UCS) of a rock specimen. Unconfirmed Compressive Strength (UCS) stands for the maximum axial compressive stress that a specimen can bear under zero confining stress. Due to the fact that stress is applied along the longitudinal axis, the ...

    Get Price
  • Excavation in rock without explosives?

    Dear friends, Can somebody help to me calculate the production rate per hour and unit rate estimate of excavation in rock (Dolomite) which is to be carried out without explosives. It would be ...

    Get Price
  • Production Rate Of Rock Breaker

    How To Calculate Productivity Of Construction Equipment . how to calculate productivity of construction equipment like excavator, dozer, rock breaker, riper.. answer / manumitra singh. case1 say 450 is used. 1)bucket cum. 2)ideal output=load per cycleno. of cycle/hour. = (considering 35 second cycle say) =240 cum. 3) apply correction factors. .

    Get Price
  • rock breaker production rates

    Production Rate Of Rock Breaker rock breaker production rates Mining. rock breaker production rates Posted at:April 14, 2013[ 49 3924 Ratings] BX Production Rates – Breaker Technology Small Breakers: Up to class (1627 Joules), are typically used in concrete and other light duty work Medium Breakers: 1200 – class ( 1627 »More detailed Compactor .

    Get Price
  • calculate productivity of a stone crusher in Mazandaran Iran seed ...

    Calculate Productivity Of A Stone Crusher. how to calculate productivity of rock breaker. There are forty years of manufacturing history, with three major production bases,over 160 senior RD engineers and 600+ large and mediumsized digital processing equipment, The firstline technicians and professional after calculate productivity of a stone crusher, .

    Get Price
  • Calculate Production Capacity of Breaker Machines | Studymode

     · Calculation of crushing equipment's production capacity: Crusher production capacity and ore properties (can be broken, specific gravity, joint, grain composition, etc.), the type of crusher, specifiions, performance and operating conditions (broken ratio, load factor and feed uniformity) and other there is no taking all these factors include all of .

    Get Price
  • 16 Best Time Tracking Productivity Apps in 2022

    Price. 16. BeeBole. BeeBole is one of the most reliable timesheet apps on the market, offering an employee time clock, project time tracking, or both. Completely customizable, it can be set up for employees to clock in and out, or to track time for clients, projects, and subprojects with a .

    Get Price
  • Construction Rates Calculation Sheets

     · The following are the construction rates calculation sheets. They are designed to make builtup rate an easy task. They are in Microsoft Excel format which most are familiar with. (1) Excavation. Excavation in rock (For viewing only) Excavation in trenches (not including planking and strutting) (For viewing only) Excavation in trenches (including planking and .

    Get Price
  • How to Estimate the Cost of Mechanical Dredging

    similar type work performed by the same or a similar dredge. For this paper, a production estimate will be developed from scratch, assuming previous records would be used as a check. To determine mechanical dredge production, the estimator must calculate production for both dredge excavation cycle and the hauling cycle. When the haul cycle time ...

    Get Price
  • Procedure for Excavation in Rocks

    The blasting sequence methods employed rock excavation should be submitted for review approval of contractor / Customer. For shallow rock cutting drilling of holes shall be carried by jack driller, for deeper blasting wagon mounted drill shall be used. The explosives shall be charged as per the calculations blasting carried.

    Get Price
  • Philippine construction productivity rates – PHILCON PRICES

     · Productivity ratios of manpower and equipment are used in the construction industry to estimate how much time is needed to complete a certain work. Check this if you are looking for inbudget but outstanding quality powertools. To see .

    Get Price
  • Rock Breakers

     · Rock Breakers. There are two classes of rock breakers machines in general use: The Blake and the Dodge crushers are representative of the former class, and the Gates and Comet crushers of the latter. The Blake Crusher is shown in section in Fig. 22. The rock is crushed between the stationary jaw, B C¹, and the swinging jaw, D, which is pivoted ...

    Get Price
  • How do jackhammers and pneumatic drills work?

     · Today, if you want to dig a hole in a hurry and there's a thick lump of concrete or asphalt in your way, you're most likely to use a jackhammer, also known as a pneumatic (airpowered) drill, rock drill, or pavement breaker. A strong and skilled road worker can swing a pickaxe 10 times a minute or more, but a jackhammer can pound the ground 150 times .

    Get Price
  • How Much Does Rock Excavation Cost? |

     · Depending on the type of rock, the size of the job, placement, contractor rates, the equipment being used, and geographical loion, most rock excavation jobs will cost 5 to 35 per cubic yard if a blasting method is used, but this price could be much higher if it were a public bid job. Because all jobs will be so unique, highly consider a ...

    Get Price
  • How to Calculate Pieces per Hour from Cycle Time?

     · Combining all add 20% allowance on the average cycle time. In your example, the operation cycle time is 30 seconds. After adding 20 allowances, the calculated cycle will be 36 seconds. This is derived from (30 seconds x )= 36 seconds. Therefore, estimated production quantity per hour = (3600/36 ) = 100 pieces.

    Get Price
  • APPLICATION OF RIPPERDOZER COMBINATION IN SURFACE .

    excavating soil and rock. Mostly it is used to excavate overburden. Ripping is method of loosening rocks using steel tynes attached to the rear of bulldozers. These tynes are lowered into the ground which displaces the soil or blocks of rocks as the whole unit moves forward. Ripping is usually economic than drilling and blasting. But as the ...

    Get Price